• DocumentCode
    2826781
  • Title

    Simulation of a production plant in the brick industry

  • Author

    Rybin, Erwin ; Breitenecker, Felix

  • Author_Institution
    Dept. of Simulation & Int. Networks, Austrian Res. Centre, Seibersdorf, Austria
  • Volume
    2
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    1915
  • Abstract
    The paper deals with a simulation study on a planned production plant in the brick industry. We implemented this plant in TAYLOR II. Although the boundary conditions seemed relatively simple, we had to manage a complex, non-linear system. For this reason we implemented “dynamic priority” to the main part of the system the travelling crane. Still this sophisticated logic was not enough to guarantee good operation, because in some situations the system runs out of capacity. We then gave recommendations how to improve the situation for a perfect operation of the production system. For this purpose we finally made an analysis of the necessary investment costs against the running costs caused by system breakdown
  • Keywords
    brick industry; cranes; discrete event simulation; manufacturing data processing; materials handling; TAYLOR II; boundary conditions; brick industry; complex nonlinear system; discrete-event simulation; dynamic priority; investment costs; manufacturing plant; material handling; production plant; production process; running costs; simulation study; system breakdown; travelling crane; Analytical models; Boundary conditions; Cooling; Costs; Cranes; Discrete event simulation; Intelligent networks; Investments; Logic; Production systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2000. Proceedings. Winter
  • Conference_Location
    Orlando, FL
  • Print_ISBN
    0-7803-6579-8
  • Type

    conf

  • DOI
    10.1109/WSC.2000.899186
  • Filename
    899186