DocumentCode
2826781
Title
Simulation of a production plant in the brick industry
Author
Rybin, Erwin ; Breitenecker, Felix
Author_Institution
Dept. of Simulation & Int. Networks, Austrian Res. Centre, Seibersdorf, Austria
Volume
2
fYear
2000
fDate
2000
Firstpage
1915
Abstract
The paper deals with a simulation study on a planned production plant in the brick industry. We implemented this plant in TAYLOR II. Although the boundary conditions seemed relatively simple, we had to manage a complex, non-linear system. For this reason we implemented “dynamic priority” to the main part of the system the travelling crane. Still this sophisticated logic was not enough to guarantee good operation, because in some situations the system runs out of capacity. We then gave recommendations how to improve the situation for a perfect operation of the production system. For this purpose we finally made an analysis of the necessary investment costs against the running costs caused by system breakdown
Keywords
brick industry; cranes; discrete event simulation; manufacturing data processing; materials handling; TAYLOR II; boundary conditions; brick industry; complex nonlinear system; discrete-event simulation; dynamic priority; investment costs; manufacturing plant; material handling; production plant; production process; running costs; simulation study; system breakdown; travelling crane; Analytical models; Boundary conditions; Cooling; Costs; Cranes; Discrete event simulation; Intelligent networks; Investments; Logic; Production systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2000. Proceedings. Winter
Conference_Location
Orlando, FL
Print_ISBN
0-7803-6579-8
Type
conf
DOI
10.1109/WSC.2000.899186
Filename
899186
Link To Document