• DocumentCode
    282766
  • Title

    The results from a major load management project

  • Author

    Erichsen, P. ; Haase, N.

  • Author_Institution
    NESA A/S, Copenhagen, Denmark
  • fYear
    1989
  • fDate
    8-12 May 1989
  • Firstpage
    431
  • Abstract
    In Denmark a large load management investigation comprising 500 customers has been carried out. The investigation lasted 11/ 2 years. The authors describe the basis and the results of the investigation. The results show that multi-rate time-of-day tariffs bring about significant changes of behaviour, particularly with domestic customers, but also significantly with industrial and commercial customers. Over this period, tests with bidirectional communication over the power supply network were made. These showed that this solution is technically possible, if a repeater is placed at intermediate substations
  • Keywords
    electricity supply industry; load management; power system control; Denmark; electricity supply industry; load management; power supply network; power system control; tariffs;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 1989. CIRED 1989. 10th International Conference on
  • Conference_Location
    Brighton
  • Print_ISBN
    0-85296-376-9
  • Type

    conf

  • Filename
    206118