The Durkee plant upgrade from 1500 TPD to 2700 TPD
Author
Hrizuk, Michael J.
Author_Institution
Ash Grove Cement Co., Durkee, OR, USA
fYear
1999
fDate
1999
Firstpage
195
Lastpage
226
Abstract
The author describes the Durkee cement plant expansion project which was successful in meeting the five goals anticipated at the onset of the project. Ash Grove has added state-of-the-art equipment and control systems in a compact design that will enable the Durkee plant to meet the demand of a growing Northwest market well into the 21st Century. The project, from initial concept to startup, took less than 22 months and was an excellent example of cooperation between plant personnel, the equipment manufacturer and contractor to bring a major project online in this short a period of time. The effort has resulted in a plant that has met or exceeded all guarantees. The design incorporates equipment and technology, which will ensure energy efficiency, low maintenance costs, high operational availability and environmental compliance
Keywords
cement industry; commissioning; industrial power systems; maintenance engineering; process control; project engineering; USA; cement plant expansion project; commerical power systems; control systems; design; energy efficiency; environmental compliance; maintenance costs; operational availability; power equipment; projects; state-of-the-art; upgrades; Ash; Conference management; Gravity; Kilns; Material storage; Milling machines; Principal component analysis; Production; Raw materials; Satellites;
fLanguage
English
Publisher
ieee
Conference_Titel
Cement Industry Technical Conference, 1999. Conference Record. 1999 IEEE-IAS/PCA
Conference_Location
Roanoke, VA
ISSN
1079-9931
Print_ISBN
0-7803-5523-7
Type
conf
DOI
10.1109/CITCON.1999.767039
Filename
767039