• DocumentCode
    283113
  • Title

    The use of linear flow estimation in computing codes for long term system planning

  • Author

    Eunson, E.M. ; Hautot, A. ; Invernizzi, A.

  • Author_Institution
    CEGB, London, UK
  • fYear
    1988
  • fDate
    32223
  • Abstract
    In the framework of CEGB, EDF and ENEL collaboration, the three utilities exchanged their point of view, practice and experience on models for long term planning studies, within working group 1/3 `Power system planning´. Two conclusions were drawn: linear flow estimation is still useful in such tools, and is the common core of three models developed by each utility-TRESCO, ORELIA and LODEN respectively; and the design of these models is dependent on the organization of the planning processes, on the predominant problems in each of them, and on the balance between tasks executed by the model and tasks left to the user. The authors discuss these two considerations, and underline four parameters important to the planner. These are: time horizon, geography, system analysis techniques, and uncertainty/variability. Each model is analysed along these four main lines, with an extra mathematical comment
  • Keywords
    load flow; power system analysis computing; power system planning; CEGB; EDF; ENEL; LODEN; ORELIA; TRESCO; computing codes; geography; linear flow estimation; long term system planning; system analysis techniques; time horizon; uncertainty;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    CEGB/EDF/ENEL Collaboration on Power System Planning and Operation, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    208969