DocumentCode
2836981
Title
Commissiong Planning through an Operational Precedence Net Using the Primavera Software
Author
King, Diego Melo
fYear
2012
fDate
22-24 March 2012
Firstpage
62
Lastpage
66
Abstract
This article presents an idea for project management focused on the comissioning process planning structured for the construction works of PETROBRAS off-shore oil production plants. Using the best practices known for project management and project planning, the practial experience learned on the following up of the construction of these plants, and an specific software used to create schedules for large construction projects, it shows a method to reduce some problems found on the commissioning process management as a whole. It is presented here a management method that, although it seems to be difficult to execute, it could bring major benefits to project managers and to serve better the costumers commissioning requirements for the oil platforms operational conditions.
Keywords
Electronic mail; Marine technology; Planning; Project management; Software; Standards; Technological innovation; Commissioning; Planning; Project Management;
fLanguage
English
Publisher
ieee
Conference_Titel
Offshore and Marine Technology: Science and Innovation (NAVTEC), 2012 International Conference on
Conference_Location
Rio Grande, Brazil
Print_ISBN
978-1-4673-2090-0
Type
conf
DOI
10.1109/NAVTEC.2012.14
Filename
6257699
Link To Document