• DocumentCode
    283700
  • Title

    Improvement in rural network performance (power system security)

  • Author

    Taylor, P.

  • fYear
    1988
  • fDate
    1988
  • Firstpage
    42491
  • Lastpage
    42494
  • Abstract
    Following the October 1987 hurricane in the UK, a reappraisal of engineering policies indicated that the only significant weakness was in Engineering Recommendation P 2/5 on security of supply, which did not address the problem of small groups of customers who regularly experience several supply interruptions each year. In order to tackle the problem of small Working Party was set up in South Eastern Electricity Board to identify those HV circuits with the worst fault record and suggest remedial measures for as many of them as possible. The results of this work are described by the author and form the basis for a programme starting 1988/89
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Improving Supply Security on 11kV Overhead Networks, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    209776