    Network 21C-an update [overhead system protection]

  • Author

    Craddock, P.

  • fYear
    1988
  • fDate
    1988
  • Firstpage
    42705
  • Lastpage
    42710
  • Abstract
    Three distinct stages of overhead power system operation have evolved in East Midland Electricity. Experience has shown that the majority of faults affecting the overhead system were transient, nondamage, and that the best performance, in terms of the lowest `customer-hours lost´ was achieved with minimum numbers of strategically positioned fuses, coupled with automatic reclosing 11 kV switches. This replaced the initial, heavily fused, system design. The third, and current, stage is still that of a minimum `fused´ system but with optimum use of source and pole mounted automatic reclosers, new electronic sectionalisers (which can replace fuses), fault passage indicators and automatic pole mounted isolators
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Improving Supply Security on 11kV Overhead Networks, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    209783