DocumentCode
2837073
Title
Saving Computer Resources with Dual-Rate Switching in Integrated Control and Scheduling
Author
Pinho, Raoni G. ; Santos, Max M. ; Correa, Marcelo V.
Author_Institution
Centro Univ. do Leste de Minas Gerais, Minas Gerais
fYear
2006
fDate
15-17 Dec. 2006
Firstpage
1937
Lastpage
1942
Abstract
Integrated control and scheduling is a problem where the control tasks are concurrent for the computer resources and appear the necessity of use the real-time scheduling algorithm to bound the delay and jitter where have impact of the control performance in control loops, when there is the CPU (central processing unit) overload. In case of the low CPU utilization is shown that the use of real-time scheduling on tasks doesn´t have strong impact on control performance in control loops. However the designers in project run-time care with only control performance and real-time scheduling and don´t consider the efficient use from computer resources as CPU, bandwidth, memory or energy. Thus, we show how to save computer resources using the dual-rate switching control approach, where controller is switched between two different controllers sample periods depending on system state. This approach gives a desired control performance with saving computer resources where use as example the integrated control and scheduling with three servo-DC.
Keywords
delays; jitter; scheduling; time-varying systems; computer resources; controllers sample periods; delay; dual-rate switching; dual-rate switching control approach; integrated control; jitter; real-time scheduling algorithm; Bandwidth; Central Processing Unit; Centralized control; Concurrent computing; Control systems; Delay; Jitter; Processor scheduling; Runtime; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Technology, 2006. ICIT 2006. IEEE International Conference on
Conference_Location
Mumbai
Print_ISBN
1-4244-0726-5
Electronic_ISBN
1-4244-0726-5
Type
conf
DOI
10.1109/ICIT.2006.372549
Filename
4237871
Link To Document