    An active plan based critical chain method

  • Author

    Ming, Chen ; Wuliang, Peng

  • Author_Institution
    Modern Educ. Technol. Center, Shenyang Ligong Univ., Shenyang, China
  • fYear
    2009
  • fDate
    17-19 June 2009
  • Firstpage
    2765
  • Lastpage
    2769
  • Abstract
    For some projects, to void the risk of project delay, the all the tasks should be finished as soon as possible. However, the critical chain method (CCM) requires the non critical tasks to be executed as late as possible. Therefore, adopting the merits of CCM and improving it to schedule project tasks as early as possible is a meaningful work. In this paper, a new critical chain method called active plan based critical chain method is presented. Other than the old one, the new CCM is created based on the active plan, that is, all tasks should be executed as early as possible. And then, the schedule scheme of active plan based critical chain method is given, including searching critical chain, no critical chain and setting buffers. By a project case, the schedule scheme is illustrated, and the effectiveness of the schedule scheme is verified.
  • Keywords
    critical path analysis; production planning; active plan schedule scheme; critical chain method; early tasks executed; no critical chain method; project delay risks void; project management; project tasks improvement; searching critical chain method; setting buffers method; Art; Constraint theory; Delay; Educational technology; Processor scheduling; Product design; Production; Project management; Resource management; Risk management; critical chain method; planning and scheduling; project management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference, 2009. CCDC '09. Chinese
  • Conference_Location
    Guilin
  • Print_ISBN
    978-1-4244-2722-2
  • Electronic_ISBN
    978-1-4244-2723-9
  • Type

    conf

  • DOI
    10.1109/CCDC.2009.5194975
  • Filename
    5194975