DocumentCode :
2840033
Title :
Heuristic algorithm based on the Crucial Machine for the No-Wait Flow-shop scheduling
Author :
Hong Zong-you ; Pang Ha-li
Author_Institution :
Dept. of Sci., Shenyang Inst. of Chem. Technol., Shenyang, China
fYear :
2009
fDate :
17-19 June 2009
Firstpage :
5121
Lastpage :
5124
Abstract :
No-Wait flow shops characterized as the continuity of job in processing, once it begins, subsequent processing must be carried out with no delay in the passage of the job from machine to machine. Addressing the problem with objective of makespan, a constructive heuristic algorithm was proposed in this article that based on the properties of the Crucial Machine and the job insertion method. Computational results and comparisons based on benchmarks demonstrated the effectiveness of the proposed algorithm.
Keywords :
manufacturing processes; production control; scheduling; Crucial Machine; No-Wait flow shop scheduling; heuristic algorithm; job insertion method; Chemical industry; Chemical technology; Delay; Flexible manufacturing systems; Heuristic algorithms; Job shop scheduling; Manufacturing processes; Production; Scheduling algorithm; Steel; Flow Shop; Heuristic; No-Wait; Scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference, 2009. CCDC '09. Chinese
Conference_Location :
Guilin
Print_ISBN :
978-1-4244-2722-2
Electronic_ISBN :
978-1-4244-2723-9
Type :
conf
DOI :
10.1109/CCDC.2009.5194981
Filename :
5194981
Link To Document :
بازگشت