Title :
Central testing and site commissioning for a new, user programmed, 33 kV feeder protection
Author :
Mackrell, A.J. ; Postlethwaite, H.R. ; Rogers, W.J.S. ; Sanderson, J.V.H. ; An, Wen
Author_Institution :
Manweb plc, Chester, UK
fYear :
1993
fDate :
1993
Firstpage :
220
Lastpage :
223
Abstract :
A new user programmed feeder protection relay is being applied to overhead power lines in Manweb´s rural 33 kV network. The relays are complex and multifunctional. They utilise low grade variable frequency pilots and perform full unit protection, switch-onto-fault and single-end-fed tripping, voltage compensated back up protection, autoreclose, alarm and trip data logger , and indicating meters. The microprocessor protection relay for overhead line protection, MPR (OLP), was a joint development. Manweb sponsored the research and wrote the application software and GEC ALSTHOM developed hardware and operating system software. The authors set out the main methods that were used, describe the experience obtained and conclude that the programme is a success
Keywords :
commissioning; distribution networks; microcomputer applications; power overhead lines; power system computer control; power system protection; relay protection; switchgear testing; 33 kV; UK; application software; autoreclose; commissioning; data logger; distribution networks; feeder; hardware; indicating meters; microprocessor protection relay; overhead power lines; power system protection; research; switchgear testing; tripping; variable frequency pilots; voltage compensated back up protection;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Developments in Power System Protection, 1993., Fifth International Conference on
Conference_Location :
York
Print_ISBN :
0-85296-559-1
Type :
conf
Filename :
224527