• DocumentCode
    2846791
  • Title

    Future plans for e+e- factories

  • Author

    Biscari, C.

  • Author_Institution
    Ist. Nazionale di Fisica Nucl., Frascati, Italy
  • Volume
    1
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    335
  • Abstract
    In the last decade luminosities of lepton colliders have greatly risen. There are several ingredients of the success: the progress in the handling of high currents and multibunch regimes, in the beam-beam interaction limits understanding, in particle dynamics simulation codes, in the diagnostic systems to control beam sizes and orbits, in the background shielding. Now is time to go further in the high luminosity frontiers: experiments are asking for more precision measurements, and the accelerator community is facing projects where the increase of luminosity by orders of magnitude is conceivable. New ideas, main upgrades and plans in the factories presently in operation around the world are the subject of this paper.
  • Keywords
    electron accelerators; linear colliders; particle beam diagnostics; beam-beam interaction limits; e+e- factories; lepton colliders; multibunch regimes; Cooling; Impedance; Large Hadron Collider; Linear particle accelerator; Optical coupling; Power generation; Production facilities; Synchrotron radiation; Vacuum systems; Vacuum technology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1288916
  • Filename
    1288916