DocumentCode
2847325
Title
Optimal scheduling of k-unit production of cluster tools with single-blade robots
Author
Chan, Wai-Kin Victor ; Yi, Jingang ; Ding, Shengwei ; Song, Dezhen
Author_Institution
Dept. of Decision Sci. & Eng. Syst., Rensselaer Polytech. Inst., Troy, NY
fYear
2008
fDate
23-26 Aug. 2008
Firstpage
335
Lastpage
340
Abstract
The main challenge in scheduling multi-cluster tools in semiconductor manufacturing is the interactions among clusters. These interactions create a k-unit optimal production that do not exist in single-cluster tools. This paper analyzes optimal scheduling of k-unit cycle production of multi-cluster tools with single-blade robots. A resource-based method is used to analytically derive closed-form expressions for the minimal cycle time of a multi-cluster tool. Conditions for decoupling multi-cluster tools and optimality conditions for the widely used pull schedule are also presented. An example from industry production is used to illustrate the derived formula and decoupling conditions.
Keywords
industrial robots; integrated circuit manufacture; process control; scheduling; k-unit production; minimal cycle time; multi-cluster tools; optimal scheduling; semiconductor manufacturing; single-blade robots; Bridges; Job shop scheduling; Manufacturing automation; Optimal scheduling; Production; Robotics and automation; Scheduling algorithm; Semiconductor device manufacture; Service robots; Throughput;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering, 2008. CASE 2008. IEEE International Conference on
Conference_Location
Arlington, VA
Print_ISBN
978-1-4244-2022-3
Electronic_ISBN
978-1-4244-2023-0
Type
conf
DOI
10.1109/COASE.2008.4626439
Filename
4626439
Link To Document