• DocumentCode
    2847325
  • Title

    Optimal scheduling of k-unit production of cluster tools with single-blade robots

  • Author

    Chan, Wai-Kin Victor ; Yi, Jingang ; Ding, Shengwei ; Song, Dezhen

  • Author_Institution
    Dept. of Decision Sci. & Eng. Syst., Rensselaer Polytech. Inst., Troy, NY
  • fYear
    2008
  • fDate
    23-26 Aug. 2008
  • Firstpage
    335
  • Lastpage
    340
  • Abstract
    The main challenge in scheduling multi-cluster tools in semiconductor manufacturing is the interactions among clusters. These interactions create a k-unit optimal production that do not exist in single-cluster tools. This paper analyzes optimal scheduling of k-unit cycle production of multi-cluster tools with single-blade robots. A resource-based method is used to analytically derive closed-form expressions for the minimal cycle time of a multi-cluster tool. Conditions for decoupling multi-cluster tools and optimality conditions for the widely used pull schedule are also presented. An example from industry production is used to illustrate the derived formula and decoupling conditions.
  • Keywords
    industrial robots; integrated circuit manufacture; process control; scheduling; k-unit production; minimal cycle time; multi-cluster tools; optimal scheduling; semiconductor manufacturing; single-blade robots; Bridges; Job shop scheduling; Manufacturing automation; Optimal scheduling; Production; Robotics and automation; Scheduling algorithm; Semiconductor device manufacture; Service robots; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering, 2008. CASE 2008. IEEE International Conference on
  • Conference_Location
    Arlington, VA
  • Print_ISBN
    978-1-4244-2022-3
  • Electronic_ISBN
    978-1-4244-2023-0
  • Type

    conf

  • DOI
    10.1109/COASE.2008.4626439
  • Filename
    4626439