DocumentCode
2848276
Title
A geometric process maintenance model of a repairable system with a replaceable repair-facility
Author
Zhao, Bing ; Yue, Dequan ; Tian, Ruiling
Author_Institution
Coll. of Sci., Yanshan Univ., Qinhuangdao, China
fYear
2010
fDate
26-28 May 2010
Firstpage
2173
Lastpage
2178
Abstract
In this paper, we studied a simple repairable system with delayed repair and a replaceable repair-facility. The successive working times and the consecutive repair times are distributed according to geometric processes. There is a delayed repair time before each repair and the repair-facility is not completely eliable. We derive some important reliability indicates and the explicit expression of the long-run expected cost per unit time of the system.
Keywords
delays; maintenance engineering; reliability; delayed repair; delayed repair time; geometric process maintenance model; reliability; repairable system; replaceable repair-facility; working times; Costs; Delay effects; Delay systems; Educational institutions; Layout; Maintenance; Satellites; Solid modeling; Stochastic processes; Delayed Repair; Geometric Process; Renewal Process; Replacement Policy;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (CCDC), 2010 Chinese
Conference_Location
Xuzhou
Print_ISBN
978-1-4244-5181-4
Electronic_ISBN
978-1-4244-5182-1
Type
conf
DOI
10.1109/CCDC.2010.5498848
Filename
5498848
Link To Document