• DocumentCode
    2849217
  • Title

    Ant colony optimization algorithm to parallel machine scheduling problem with setups

  • Author

    Arnaout, Jean-Paul ; Musa, Rami ; Rabadi, Ghaith

  • Author_Institution
    Ind. & Mech. Eng. Dept., Lebanese American Univ., Beirut
  • fYear
    2008
  • fDate
    23-26 Aug. 2008
  • Firstpage
    578
  • Lastpage
    582
  • Abstract
    This paper addresses the non-preemptive unrelated parallel machine scheduling problem with machine-dependent and job sequence-dependent setup times. All jobs are available at time zero, all times are deterministic, and the objective is to minimize the makespan. This is a NP-hard problem and in this paper, a two-stage ant colony optimization (ACO) algorithm is introduced and its performance is evaluated by comparing its solutions to the solutions of Tabu Search and an existing heuristic for the same problem. The results show that ACO outperformed the other algorithms.
  • Keywords
    computational complexity; optimisation; parallel machines; scheduling; search problems; NP-hard problem; ant colony optimization algorithm; job sequence-dependent setup times; machine-dependent setup times; parallel machine scheduling; tabu search; Ant colony optimization; Automation; Bridges; Job shop scheduling; Manufacturing industries; NP-hard problem; Parallel machines; Partitioning algorithms; Scheduling algorithm; USA Councils;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering, 2008. CASE 2008. IEEE International Conference on
  • Conference_Location
    Arlington, VA
  • Print_ISBN
    978-1-4244-2022-3
  • Electronic_ISBN
    978-1-4244-2023-0
  • Type

    conf

  • DOI
    10.1109/COASE.2008.4626566
  • Filename
    4626566