DocumentCode
2849217
Title
Ant colony optimization algorithm to parallel machine scheduling problem with setups
Author
Arnaout, Jean-Paul ; Musa, Rami ; Rabadi, Ghaith
Author_Institution
Ind. & Mech. Eng. Dept., Lebanese American Univ., Beirut
fYear
2008
fDate
23-26 Aug. 2008
Firstpage
578
Lastpage
582
Abstract
This paper addresses the non-preemptive unrelated parallel machine scheduling problem with machine-dependent and job sequence-dependent setup times. All jobs are available at time zero, all times are deterministic, and the objective is to minimize the makespan. This is a NP-hard problem and in this paper, a two-stage ant colony optimization (ACO) algorithm is introduced and its performance is evaluated by comparing its solutions to the solutions of Tabu Search and an existing heuristic for the same problem. The results show that ACO outperformed the other algorithms.
Keywords
computational complexity; optimisation; parallel machines; scheduling; search problems; NP-hard problem; ant colony optimization algorithm; job sequence-dependent setup times; machine-dependent setup times; parallel machine scheduling; tabu search; Ant colony optimization; Automation; Bridges; Job shop scheduling; Manufacturing industries; NP-hard problem; Parallel machines; Partitioning algorithms; Scheduling algorithm; USA Councils;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering, 2008. CASE 2008. IEEE International Conference on
Conference_Location
Arlington, VA
Print_ISBN
978-1-4244-2022-3
Electronic_ISBN
978-1-4244-2023-0
Type
conf
DOI
10.1109/COASE.2008.4626566
Filename
4626566
Link To Document