DocumentCode :
2851183
Title :
The scheduling of project time, cost and product quality
Author :
Peng, WuLiang ; Zhang, Zhongliang ; Tian, Zhaofu
Author_Institution :
Sch. of Econ. & Manage., Shenyang Ligong Univ., Shenyang, China
fYear :
2010
fDate :
26-28 May 2010
Firstpage :
150
Lastpage :
154
Abstract :
To optimize the product quality as well as project cost, a discrete time/cost/product quality trade-off model used for product development projects was presented on the theoretical basis of resource constrained project scheduling problem (RCPSP). According to the characteristics of product development project, the project cost is calculated by the price of resources, and the quality function deployment method (QFD) is used to quantitatively calculate product quality. A brand and cut algorithm was presented to solve the model. Finally the model and its algorithm were verified by a project case.
Keywords :
product development; project management; quality function deployment; scheduling; brand and cut algorithm; discrete time-cost-product quality; product development; product quality; project time scheduling; quality function deployment method; resource constrained project scheduling problem; Constraint theory; Cost function; Humans; Linear programming; Product development; Project management; Quality function deployment; Quality management; Remuneration; Resource management; product quality; project management; resource constrained project scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2010 Chinese
Conference_Location :
Xuzhou
Print_ISBN :
978-1-4244-5181-4
Electronic_ISBN :
978-1-4244-5182-1
Type :
conf
DOI :
10.1109/CCDC.2010.5499105
Filename :
5499105
Link To Document :
بازگشت