DocumentCode :
2851748
Title :
To solve train-set scheduling problem with considering the inspection capacities of multi-depots
Author :
Caichun Zhang ; Wei Hua ; Jianhua Chen ; Liang Zhu
Author_Institution :
Sch. of Traffic & Transp., Beijing Jiaotong Univ., Beijing, China
fYear :
2009
fDate :
17-17 Oct. 2009
Firstpage :
276
Lastpage :
280
Abstract :
The cost of one train-set is very expensive, so how to minimize the amount of train-sets in use is more critical especially under this new round of economic crisis. Consequently, the train-set operation plan has better to program together with its inspection plan, not to be scheduled by different departments. Hence, the inspection capacities of related depots must be considered as programming the train-set operation plan. Under the regulation of China Railway High-speed (CRH) train-set, a new model is presented to solve train-set scheduling problem which considers the inspection capacities of multi-depots. Several schedulings for the Jing-Jin dedicated passenger line are programmed and the results show that train-set scheduling differs greatly from traditional railway operation and more train-sets are needed than the expectation, but by relaxing the inspection limits, the amount of train-sets in use will decrease.
Keywords :
industrial economics; inspection; production planning; railway industry; scheduling; China Railway High-speed train-set; economic crisis; inspection capacity; inspection plan; multidepots; passenger line; railway operation; train-set operation plan; train-set scheduling; ant algorithm; depot; inspection capacity; scheduling; train-set;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advanced Forum on Transportation of China (AFTC 2009), 5th
Conference_Location :
Beijing
ISSN :
0537-9989
Type :
conf
DOI :
10.1049/cp.2009.1628
Filename :
5499199
Link To Document :
بازگشت