DocumentCode :
2852696
Title :
Robust optimization for resource-constrained project scheduling with uncertain activity durations
Author :
Leus, R. ; Artigues, C. ; Nobibon, F. Talla
Author_Institution :
Dept. of Decision Sci. & Inf. Manage., K.U. Leuven, Leuven, Belgium
fYear :
2011
fDate :
6-9 Dec. 2011
Firstpage :
101
Lastpage :
105
Abstract :
The purpose of this paper is to propose models for project scheduling when there is considerable uncertainty in the activity durations, to the extent that the decision maker cannot with confidence associate probabilities with the possible scenarios. Our modeling techniques stem from robust optimization, which is a theoretical framework that enables the decision maker to produce solutions that will have a reasonably good objective value under any likely input data scenario. We develop and implement a scenario-relaxation algorithm and a scenario-relaxation-based heuristic. The first algorithm produces optimal solutions but requires excessive running times even for medium-sized instances; the second algorithm produces high-quality solutions for medium-sized instances and outperforms two benchmark heuristics.
Keywords :
decision making; optimisation; probability; scheduling; confidence associate probabilities; input data scenario; modeling techniques; resource-constrained project scheduling; robust optimization; scenario-relaxation algorithm; scenario-relaxation-based heuristic; uncertain activity durations; Optimization; Processor scheduling; Resource management; Robustness; Schedules; Uncertainty; Vectors; RCPSP; project scheduling; robust optimization; uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
Conference_Location :
Singapore
ISSN :
2157-3611
Print_ISBN :
978-1-4577-0740-7
Electronic_ISBN :
2157-3611
Type :
conf
DOI :
10.1109/IEEM.2011.6117887
Filename :
6117887
Link To Document :
بازگشت