    Prioritizing activities on a building site project

  • Author

    Alencar, L.H. ; Almeida, A.T. ; Mota, C.M.M.

  • Author_Institution
    Dept. of Manage. Eng., Fed. Univ. of Pernambuco, Recife, Brazil
  • fYear
    2011
  • fDate
    6-9 Dec. 2011
  • Firstpage
    884
  • Lastpage
    887
  • Abstract
    The increase in competitiveness in the construction industry has been compelling companies to offer better quality products that are completed on time. This is not an easy task. One of the essential aspects to be catered for so as to reach this aim is to engage on adequate planning, which involves prioritizing the activities to be carried out. This includes medium-term planning. During this stage, many aspects should be considered so that an adequate analysis can be made of activities that can be carried out, which do not cause problems for long-term planning. Therefore, this study presents a more structured decision-making model for medium-term project planning, such that the activities that can be carried out in the period of analysis can be prioritized in accordance with the aspects that the project manager considers most important. An application on a building site project is presented.
  • Keywords
    construction industry; decision making; planning; project management; activity prioritization; building site project; construction industry has; decision-making model; long-term planning; medium-term planning; Buildings; Companies; Delay; Materials; Project management; Schedules; Project management; building site; multicriteria decision aid;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
  • Conference_Location
    Singapore
  • ISSN
    2157-3611
  • Print_ISBN
    978-1-4577-0740-7
  • Electronic_ISBN
    2157-3611
  • Type

    conf

  • DOI
    10.1109/IEEM.2011.6118043
  • Filename
    6118043