• DocumentCode
    2855458
  • Title

    A hybrid algorithm for earliness-tardiness scheduling problem with sequence dependent setup time

  • Author

    Wang, Li ; Wang, Mengguang

  • Author_Institution
    Inf. Sci. & Eng. Coll., Northeastern Univ., Boston, MA, USA
  • Volume
    2
  • fYear
    1997
  • fDate
    10-12 Dec 1997
  • Firstpage
    1219
  • Abstract
    In this paper, we consider single machine earliness-tardiness scheduling problem with sequence dependent setup time under different due dates. The objective is to minimize the penalty function, which includes the penalty of completion time of the job is early or tardy for its due date and the penalty of total setup time between jobs. For this problem, we form a hybrid algorithm by combining the heuristic with a genetic algorithm after giving a heuristic. The results of experiment show this algorithm is efficient
  • Keywords
    genetic algorithms; heuristic programming; minimisation; scheduling; due dates; earliness-tardiness scheduling problem; genetic algorithm; heuristic; hybrid algorithm; penalty function minimization; sequence dependent setup time; Casting; Continuous production; Educational institutions; Genetic algorithms; Information science; Iron; Job shop scheduling; Metals industry; Scheduling algorithm; Single machine scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 1997., Proceedings of the 36th IEEE Conference on
  • Conference_Location
    San Diego, CA
  • ISSN
    0191-2216
  • Print_ISBN
    0-7803-4187-2
  • Type

    conf

  • DOI
    10.1109/CDC.1997.657619
  • Filename
    657619