DocumentCode
2856135
Title
A multi-period facility location-relocation problem in the presence of a probabilistic line barrier
Author
Amiri-Aref, M. ; Javadian, N. ; Tavakkoli-Moghaddam, R. ; Aryanezhad, M.B.
Author_Institution
Dept. of Ind. Eng., Mazandaran Univ. of Sci. & Technol., Babol, Iran
fYear
2011
fDate
6-9 Dec. 2011
Firstpage
1118
Lastpage
1122
Abstract
This paper presents a mixed-integer nonlinear programming model (MINLP) for a multi-period facility location-relocation problem in the presence of a line-shaped barrier, which the starting point of the barrier follows the uniform distribution function. Rectilinear metric for the distance between points is supposed. The objective function of the proposed model minimizes the cost of traveled expected barrier distance and the cost of relocation, if occur, during the finite planning horizon. In addition, to show the capability of the proposed model, a numerical example is investigated and the associated results are compared with the results of problem without barrier.
Keywords
facility location; integer programming; nonlinear programming; planning; probability; MINLP; finite planning; line-shaped barrier; mixed-integer nonlinear programming model; multiperiod facility location-relocation problem; probabilistic line barrier; rectilinear metric; uniform distribution function; Educational institutions; Mathematical model; Measurement; Planning; Probabilistic logic; Production; Programming; facility location-relocation; line barrier; mathematical model;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2011 IEEE International Conference on
Conference_Location
Singapore
ISSN
2157-3611
Print_ISBN
978-1-4577-0740-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2011.6118089
Filename
6118089
Link To Document