DocumentCode
2860636
Title
Operational performance in 2.5 GeV full enenrgy injection at PLS
Author
Kim, E.-S. ; Han, Y.J. ; Jeong, S.-H. ; Kim, M.-G. ; Kim, S.-C. ; Park, S.-S. ; Seo, J.-H.
Author_Institution
Pohang Accel. Lab., Pohang Inst. of Sci. & Technol.
Volume
5
fYear
2003
fDate
12-16 May 2003
Firstpage
3114
Lastpage
3116
Abstract
The PLS has provided 2.5 GeV electron beam to users of beam lines since Jan. 2000. During Jan. 2000 to Oct. 2002, 2 GeV electron beam was injected from the linac to the storage ring and the storage ring had used energy ramping process to increase the beam energy to 2.5 GeV. Instead of energy ramping process, we have used the 2.5 GeV full energy injection from the linac to the storage ring since Oct. 2002. We present the activities on the stability and reliability of the linac for 2.5 GeV operation, stabilities of injection kicker and septum magnets in the storage ring, orbit correction of COD due to leakage field of the septum magnet, and a DC bump for beam injection. Orbit stabilities and global orbit correction on the operation of 2.5 GeV full energy injection are also presented
Keywords
accelerator magnets; electron accelerators; linear accelerators; particle beam injection; storage rings; 2.5 GeV; COD; PLS; electron beam; full energy injection; global orbit correction; injection kicker; leakage field; linac; orbit stabilities; septum magnets; storage ring; Acceleration; Electron beams; Klystrons; Linear particle accelerator; Particle beams; Pulse modulation; Radio frequency; Stability; Storage rings; Temperature;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
Conference_Location
Portland, OR
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1289832
Filename
1289832
Link To Document