DocumentCode
2861061
Title
The Solution of Nuclear Power Overhaul Multi-project Management Based on Primavera Software
Author
Wu, Yanhua ; Lin, Shushun ; Zhang, Zheng
Author_Institution
Inf. Technol. Center, China Nucl. Power Technol. Res. Inst., Shenzhen, China
fYear
2011
fDate
16-18 Dec. 2011
Firstpage
270
Lastpage
273
Abstract
We analyze the application problems of the Primavera software in the overhaul schedule management of nuclear power plant firstly, and then elaborate the research program of nuclear power overhaul multi-project management based on Primavera software in order to address these issues. In this paper, we focus on the implementation of nuclear power overhaul schedule management assistant system based on Primavera software as well as the main components of the system. What´s more, we demonstrate the business process of the total solution by the application examples. Finally, we illustrate the program has a good reference and promotion of significance for the domestic nuclear power industry overhaul.
Keywords
maintenance engineering; nuclear engineering computing; nuclear power stations; project management; scheduling; Primavera software; domestic nuclear power industry; nuclear power overhaul multiproject management; nuclear power plant; overhaul schedule management; schedule management assistant system; Databases; Graphics; Project management; Schedules; Software; Synchronization; Nuclear power overhaul; Overhaul schedule management; Primavere Software;
fLanguage
English
Publisher
ieee
Conference_Titel
Innovations in Bio-inspired Computing and Applications (IBICA), 2011 Second International Conference on
Conference_Location
Shenzhan
Print_ISBN
978-1-4577-1219-7
Type
conf
DOI
10.1109/IBICA.2011.71
Filename
6118592
Link To Document