DocumentCode :
2862346
Title :
Fermilab recycler stochastic cooling commissioning and performance
Author :
Broemmelsiek, D. ; Pasquinelli, R.
Author_Institution :
Fermi Nat. Accel. Lab.
Volume :
5
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
3431
Lastpage :
3433
Abstract :
The Fermilab Recycler is a fixed 8 GeV kinetic energy storage ring located in the Fermilab Main Injector tunnel near the ceiling. The recycler has two roles in Run II. First, to store antiprotons from the Fermilab Antiproton Accumulator so that the antiproton production rate is no longer compromised by large numbers of antiprotons stored in the accumulator. Second, to receive antiprotons from the Fermilab Tevatron at the end of luminosity periods. To perform each of these roles, stochastic cooling in the recycler is needed to preserve and cool antiprotons in preparation for transfer to the Tevatron. The commissioning and performance of the Recycler stochastic cooling systems will be reviewed
Keywords :
beam handling techniques; proton accelerators; storage rings; 8 GeV; Fermilab Main Injector tunnel; Fermilab Tevatron; Fermilab antiproton accumulator; Fermilab recycler stochastic cooling; antiproton cooling; antiproton production rate; storage ring; Bandwidth; Cooling; Filters; Frequency; Hafnium; Heating; Phased arrays; Stochastic processes; Stochastic resonance; Stochastic systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
Conference_Location :
Portland, OR
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1289938
Filename :
1289938
Link To Document :
بازگشت