DocumentCode
2863571
Title
Engineering Materials Management Pattern Research and Implementation for Generation III Nuclear Power Plant
Author
Wu, Ting ; Xu, Jia-Shu ; Tan, Zhi-Feng
Author_Institution
Inf. Technol. Center, China Nucl. Power Technol. Res. Inst., Shenzhen, China
fYear
2011
fDate
16-18 Dec. 2011
Firstpage
290
Lastpage
293
Abstract
The construction of a nuclear power plant is a very complex systematic project, mainly including engineering, procurement, construction and start-up phases. Among those stages, engineering materials management is a fundamental and decisive job. In this paper, the engineering materials´ properties are researched. In order to manage the engineering materials in VPRM efficiently, we proposed the nuclear power plant engineering materials classification method, and developed three kinds of workflow based on VPRM, effectively solved the problems of engineering materials management of the third generation nuclear power plant. In the paper an example of the third generation nuclear power plant engineering materials management application is given, which namely the Taishan Nuclear Power Plant Engineering Management System.
Keywords
building materials; nuclear power stations; VPRM; complex systematic project; engineering materials management pattern research; generation III nuclear power plant; nuclear power plant engineering materials; Documentation; Materials; Power generation; Procurement; Project management; Software; Valves; EPCS; Materials Management; Nuclear Power Plant; VPRM; Workflow;
fLanguage
English
Publisher
ieee
Conference_Titel
Innovations in Bio-inspired Computing and Applications (IBICA), 2011 Second International Conference on
Conference_Location
Shenzhan
Print_ISBN
978-1-4577-1219-7
Type
conf
DOI
10.1109/IBICA.2011.77
Filename
6118789
Link To Document