  • Title

    Large scale UPS installations

  • Author

    Philpott, S.R.

  • fYear
    1993
  • fDate
    8-9 Jun 1993
  • Firstpage
    64
  • Lastpage
    68
  • Abstract
    The initial design concept of electrical supply to Barclays Data Centres relied upon two completely independent incoming mains, either of which would adequately support the center load. Diesel standby was installed to cater for outages affecting both incoming supplies. Some three years ago a review took place from which a successful business case was made to retrospectively install five large UPS systems into four centers. This paper sets out to outline:- research into equipment types, their characteristics and tests applied; selection of equipment; strategy for installation; design constraints and compromises; and conclusions
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electrical Installation Engineering in Europe, 1993., International Conference on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    243382