    Design & installation of 22 kV power cable for London Underground Central Line refurbishment project

  • Author

    Field, C.J. ; Journeaux, T.L.

  • Author_Institution
    London Underground Ltd., UK
  • fYear
    1993
  • fDate
    23-25 Nov 1993
  • Firstpage
    184
  • Lastpage
    189
  • Abstract
    London Underground´s Central Line refurbishment project encompasses the complete refurbishment of the line including the provision of new trains, signalling systems and power supply systems. The power supplies refurbishment concerns renewal of all life expired equipment and the enhancement of equipment to meet increased demands for traction loads to a peak service loading of 36 trains per hour and the upgrading of power feeds to maintenance depots. When finished the total project will have cost approximately £700 m of which approximately £50 m will have been spent on the power system refurbishment. The work has been conducted in three stages of which the last was the Eastern section from Bethnal Green substation to Epping substation which is the subject of this paper
  • Keywords
    maintenance engineering; power cables; power systems; project engineering; railways; substations; 22 kV; London Underground; UK; installation; maintenance; power cable; power feeds; power supply systems; railways; refurbishment project; signalling; substation; traction loads; trains;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Power Cables and Accessories 10kV - 500kV, 1993., Third International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-592-3
  • Type

    conf

  • Filename
    263355