• DocumentCode
    2869055
  • Title

    Petri Net Modeling for Production Logistics Process

  • Author

    Li Yongyao ; Wang Xiaoming

  • Author_Institution
    Coll. of Math. & Comput. Sci., Fujian Normal Univ., Fuzhou, China
  • fYear
    2009
  • fDate
    11-13 Dec. 2009
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    Time delay is introduced into coloured Petri net, then the fixed time delay coloured Petri net is established. This kind of Petri net model can describe actual behavior of dynamic system. Utilizing the model, the modeling method for production logistics process is posed, and an actual model about task control process of overhead crane and smelting furnace is established. It is showed that the method is feasible and convenient to modeling.
  • Keywords
    Petri nets; logistics; manufacturing processes; Petri net modeling; delay coloured Petri net; dynamic system; modeling method; overhead crane; production logistics process; smelting furnace; task control process; Computer science; Cranes; Delay effects; Educational institutions; Logistics; Mathematical model; Mathematics; Petri nets; Process control; Production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Intelligence and Software Engineering, 2009. CiSE 2009. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4507-3
  • Electronic_ISBN
    978-1-4244-4507-3
  • Type

    conf

  • DOI
    10.1109/CISE.2009.5366525
  • Filename
    5366525