Title :
Changing the 1981 spine-based ducks [wave power generation]
Author_Institution :
Edinburgh Univ., UK
Abstract :
The author describes the modifications which have resulted from the analysis by Thorpe (1992) and Wickham (1992) of capital cost, productivity and availability of the 2000 MW spine-based duck scheme. Familiarity with duck ideas in wave power generation is assumed
Keywords :
economics; project engineering; wave power generation; wave power plants; 2000 MW; availability; capital cost; economics; modifications; productivity; project engineering; spine-based ducks; wave power plants;
Conference_Titel :
Renewable Energy - Clean Power 2001, 1993., International Conference on
Conference_Location :
London
Print_ISBN :
0-85296-605-9