• DocumentCode
    287022
  • Title

    Synchronised planning and control of focused manufacturing and assembly cells

  • Author

    Davidson, Carolyn

  • Author_Institution
    Lansing Linde Ltd., Basingstoke
  • fYear
    1992
  • fDate
    33759
  • Firstpage
    42401
  • Lastpage
    42404
  • Abstract
    Lansing Linde Ltd. at Basingstoke specializes in the design and manufacture of battery electric powered trucks. The company has for some time been developing a short lead time facility based on focused production cells planned and controlled synchronously to satisfy actual customer orders. This paper outlines Lansing´s strategy, and consequential change in approach to production planning and control, highlighting how these tasks become simpler in a synchronous factory. This in turn leads to simpler requirements for computer systems. However, major challenges in manufacturing engineering and cultural change must first be overcome
  • Keywords
    assembling; automobile industry; factory automation; production control; Lansing Linde; assembly; electric powered trucks; factory automation; focused manufacturing cells; lead time; production control; synchronised production planning; synchronous factory;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Distributed MRP and Cellular Manufacture, IEE Seminar on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    264714