• DocumentCode
    2870576
  • Title

    North American SynchroPhasor Initiative

  • Author

    Dagle, J.E.

  • Author_Institution
    Pacific Northwest Nat. Lab., Richland
  • fYear
    2008
  • fDate
    7-10 Jan. 2008
  • Firstpage
    165
  • Lastpage
    165
  • Abstract
    In 2007, the U.S. Department of Energy (DOE) and the North American Electric Reliability Corporation (NERC), along with involved electric utility companies and other organizations, formed the North American SynchroPhasor Initiative (NASPI). This effort combines the previous Eastern Interconnection Phaser Project (EIPP) and various activities associated with wide area measurement system (WAMS) research, development, and deployment activities that have been underway in the North American electric power system for a number of years as the primary focal point for continued DOE and NERC support and facilitation. This paper provides an update on this activity, building on a paper presented at last year´s forum (Widergren et al., 2007).
  • Keywords
    electric power generation; electricity supply industry; power engineering computing; power system measurement; North American Electric Reliability Corporation; North American SynchroPhasor Initiative; North American electric power system; US Department of Energy; electric utility company; wide area measurement system; Laboratories; Monitoring; Power industry; Power measurement; Power system planning; Power system reliability; Power systems; Telecommunication network reliability; US Department of Energy; Wide area measurements;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Hawaii International Conference on System Sciences, Proceedings of the 41st Annual
  • Conference_Location
    Waikoloa, HI
  • ISSN
    1530-1605
  • Type

    conf

  • DOI
    10.1109/HICSS.2008.328
  • Filename
    4438868