DocumentCode
2873771
Title
Effect of Sluge Retention Time on Nutrient Removal by a Humus Soil Sequencing Batch Reactor
Author
Zhu, Rui ; Wu, Min ; Yang, Jian ; Wei, Chuanyin ; Zhang, Bin
Author_Institution
State Key Lab. of Pollution Control & Resources Reuse, Tongji Univ., Shanghai, China
Volume
3
fYear
2009
fDate
16-18 Oct. 2009
Firstpage
290
Lastpage
293
Abstract
A laboratory-scale sequencing batch reactor combined with humus soil (HS-SBR) and a sequencing batch reactor (SBR) fed with domestic wastewater were operated to examine the effect of varying sludge retention time (SRT) on the nutrient removal. With 10 days SRT. During acclimatize phase, TP removal efficiency for HS-SBR enhanced and shortened period of time to reaching the steady-state condition. It opposing organic loading capacity was stronger than SBR during the steady-state condition. TP and TN removal efficient did not affect and fallen in 80- 100% and 60-75% respectively. With the increased SRT until to 30 days, HS-SBR had better removal efficiency than SBR, at the same time, and had a lower sludge production rate. During the long SRT period, the highest MLSS from SBR and HS-SBR systems was 5051 mg/L and 4437 mg/L respectively. When SRT maintained about 25 days, HS-SBR had a high nutrient removal.
Keywords
bioreactors; sludge treatment; soil; wastewater treatment; domestic wastewater treatment; humus soil; nutrient removal; sequencing batch reactor; sludge production rate; sludge retention time; Biomass; Inductors; Nitrogen; Pollution control; Production; Sewage treatment; Soil; Solids; Steady-state; Wastewater treatment; SBR; humus soil; sludge retention time; wasterwater;
fLanguage
English
Publisher
ieee
Conference_Titel
Energy and Environment Technology, 2009. ICEET '09. International Conference on
Conference_Location
Guilin, Guangxi
Print_ISBN
978-0-7695-3819-8
Type
conf
DOI
10.1109/ICEET.2009.535
Filename
5366823
Link To Document