DocumentCode
2875605
Title
Informatics for project structuring
Author
Osterlund, Jan
Author_Institution
Stockholm Univ., Sweden
fYear
1991
fDate
27-31 Oct 1991
Firstpage
185
Abstract
Summary form only given. The author discusses a four-year consultant and research work intended to develop a project management method for the Bofors company. The projects concerns large defense systems utilizing many different technologies. The method is required to take care of the various needs from many different categories of human competencies, and will be coordinated and controlled by informatics. The method consists of three process cycles: (1) structuring during planning in different tree structures of function, work, cost, and responsibility; (2) specifying work packages to define the operative units responsibility for them; and (3) controlling progress with the help of activity networks as information bases enabling control by feedback. The different cycles of the structuring process have been considered together with the project dimension of a three-dimensional information system covering the complete R&D process
Keywords
management information systems; military systems; project engineering; research and development management; 3D; R&D; activity networks; defense systems; development; feedback; informatics; information system; project management; project structuring; research; tree structures; work packages; Expert systems; Government; Informatics; Management information systems; Milling machines; Project management; Research and development; Research and development management; Snow;
fLanguage
English
Publisher
ieee
Conference_Titel
Technology Management : the New International Language
Conference_Location
Portland, OR
Print_ISBN
0-7803-0161-7
Type
conf
DOI
10.1109/PICMET.1991.183610
Filename
183610
Link To Document