DocumentCode :
2875900
Title :
Project valuation and scheduling with recourse
Author :
Phillips, Fred Y. ; Srivastava, Rajendra K. ; Springer, Roy E.
Author_Institution :
Texas Univ., Austin, TX, USA
fYear :
1991
fDate :
27-31 Oct 1991
Firstpage :
266
Lastpage :
271
Abstract :
A model is presented to treat new product development projects that are subject to a mid-project management review. The model solves a `chicken and egg´ problem in concurrent life cycle analysis, namely that a project cannot be costed until it is scheduled, cannot be scheduled until the continuation decision is made, and cannot be evaluated for continuation until it is costed. The model solves the conundrum via a mixed integer programming formulation that makes all three determinations simultaneously. It poses the problem as an exercise in managerial options. A worked example illustrates the technique
Keywords :
integer programming; project engineering; research and development management; scheduling; R&D management; concurrent life cycle analysis; continuation decision; costing; mixed integer programming; model; optimisation; product development projects; research; scheduling; valuation; Concurrent engineering; Cost accounting; Delay; Integrated circuit modeling; Job shop scheduling; Linear programming; Optimal scheduling; Product development; Project management; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Technology Management : the New International Language
Conference_Location :
Portland, OR
Print_ISBN :
0-7803-0161-7
Type :
conf
DOI :
10.1109/PICMET.1991.183630
Filename :
183630
Link To Document :
بازگشت