Title : 
The post-evaluation of an engineering project via AHP
         
        
            Author : 
Sinuany-Stern, Zilla ; Amitai, Atzmon
         
        
            Author_Institution : 
Dept. of Ind. Eng. & Manage., Ben-Gurion Univ., Beer Sheva, Israel
         
        
        
        
        
        
            Abstract : 
The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts
         
        
            Keywords : 
production; project engineering; Beer-Sheva; Israel; analytical hierarchy; cleaning detergent; engineering project; maintenance; parts accessibility; performance quality; post-evaluation; production line; Cleaning; Costs; Delay; Engineering management; Industrial engineering; Job shop scheduling; Production; Project management; Technology management; Uncertainty;
         
        
        
        
            Conference_Titel : 
Technology Management : the New International Language
         
        
            Conference_Location : 
Portland, OR
         
        
            Print_ISBN : 
0-7803-0161-7
         
        
        
            DOI : 
10.1109/PICMET.1991.183632