DocumentCode
2875919
Title
The post-evaluation of an engineering project via AHP
Author
Sinuany-Stern, Zilla ; Amitai, Atzmon
Author_Institution
Dept. of Ind. Eng. & Manage., Ben-Gurion Univ., Beer Sheva, Israel
fYear
1991
fDate
27-31 Oct 1991
Firstpage
275
Lastpage
277
Abstract
The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts
Keywords
production; project engineering; Beer-Sheva; Israel; analytical hierarchy; cleaning detergent; engineering project; maintenance; parts accessibility; performance quality; post-evaluation; production line; Cleaning; Costs; Delay; Engineering management; Industrial engineering; Job shop scheduling; Production; Project management; Technology management; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Technology Management : the New International Language
Conference_Location
Portland, OR
Print_ISBN
0-7803-0161-7
Type
conf
DOI
10.1109/PICMET.1991.183632
Filename
183632
Link To Document