  • Title

    The post-evaluation of an engineering project via AHP

  • Author

    Sinuany-Stern, Zilla ; Amitai, Atzmon

  • Author_Institution
    Dept. of Ind. Eng. & Manage., Ben-Gurion Univ., Beer Sheva, Israel
  • fYear
    1991
  • fDate
    27-31 Oct 1991
  • Firstpage
    275
  • Lastpage
    277
  • Abstract
    The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts
  • Keywords
    production; project engineering; Beer-Sheva; Israel; analytical hierarchy; cleaning detergent; engineering project; maintenance; parts accessibility; performance quality; post-evaluation; production line; Cleaning; Costs; Delay; Engineering management; Industrial engineering; Job shop scheduling; Production; Project management; Technology management; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Technology Management : the New International Language
  • Conference_Location
    Portland, OR
  • Print_ISBN
    0-7803-0161-7
  • Type

    conf

  • DOI
    10.1109/PICMET.1991.183632
  • Filename
    183632