    Cost based allocation of resources in project planning

  • Author

    Deckro, Richard F. ; Hebert, John E. ; Verdini, William A.

  • Author_Institution
    Portland State Univ., OR, USA
  • fYear
    1991
  • fDate
    27-31 Oct 1991
  • Firstpage
    278
  • Lastpage
    283
  • Abstract
    A cost-based/resource allocation model is presented which provides an effective tool for modeling project or job shop scheduling situations which are resource critical. The common denominator of cost is used to acquire and assign resources throughout the duration of the operation. This cost-based allocation model is based on the variable definitions of A.A. Pritsker et al. (1969), as utilized by R.F. Deckro and J.E. Hebert (1989). This model should prove to be valuable in aiding in the conceptualization of resource needs during planning stages in both project and manufacturing settings
  • Keywords
    economics; project engineering; scheduling; cast-based resource allocation; job shop scheduling; manufacturing settings; planning; project planning; Acceleration; Computer crashes; Cost function; Engineering management; Research and development management; Resource management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Technology Management : the New International Language
  • Conference_Location
    Portland, OR
  • Print_ISBN
    0-7803-0161-7
  • Type

    conf

  • DOI
    10.1109/PICMET.1991.183633
  • Filename
    183633