Abstract :
The typical single line diagram of a 40-50 MW open cycle GTG plant is indicated. The plant would typically incorporate a single aeroderivative gas turbine with no requirement to operate as an island with any adjacent industrial site. The two sections of the electrical system are: the connection to the REC, and the derivation of supplies for electrical auxiliaries. Both electrical system sections are discussed