DocumentCode :
2877214
Title :
Survey of LLRF development for the ILC
Author :
Branlard, J. ; Simrock, S. ; Michizono, S.
Author_Institution :
FNAL, Batavia
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
3810
Lastpage :
3812
Abstract :
The key to a successful LLRF design for the International Linear Collider (ILC) relies on a combined effort from the different laboratories involved in this global project. This paper covers the ILC LLRF design progress both long term and for current test facilities around the world. The SIMCON controller board, originally developed at DESY has been successfully used at FNAL to control superconducting capture cavity I and II. LLRF team leaders from DESY, KEK and FNAL have worked together toward a common design and costing estimate for the ILC LLRF. This paper gives a general overview of the LLRF development achieved through continuous collaboration and communication between the various labs involved in the ILC LLRF design process.
Keywords :
linear colliders; physics computing; DESY; ILC; LLRF control system; SIMCON controller board; international linear collider; superconducting capture cavity; Communication system control; Delay; Digital signal processing; Field programmable gate arrays; Laboratories; Radio frequency; Research and development; Signal processing algorithms; Test facilities; X-ray lasers;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4439914
Filename :
4439914
Link To Document :
بازگشت