DocumentCode
2878653
Title
State of the Art of Telecommunications Power in the UK
Author
White, I.G.
Author_Institution
BRITISH POST OFFICE TELECOMMUNICATIONS HEADQUARTERS
fYear
1978
fDate
25-27 Oct. 1978
Firstpage
11
Lastpage
17
Abstract
Telecommunications equipment in the UK is supplied from a central, standard and modular power plant. Reliability and security is therefore regarded as of prime importance. The paper describes the current approach to modular plant both in the AC and DC fields. Flexibility in planning and installation is achieved, capital costs are minimised and maintenance charges are reduced. The impact of electronic switching systems and the transition to digital techniques is reviewed, as is the need for energy conservation and future alternative power sources.
Keywords
Communication switching; Costs; Engines; Maintenance; Power generation; Power system planning; Power system reliability; Telecommunication standards; Telecommunication switching; Telephony;
fLanguage
English
Publisher
ieee
Conference_Titel
Telephone Energy Conference, 1978. INTELEC '78. International
Conference_Location
Washington, DC, USA
Type
conf
DOI
10.1109/INTLEC.1978.4793514
Filename
4793514
Link To Document