DocumentCode :
2879838
Title :
Worth of a Watt - Implications for Systems and Device Designers
Author :
Goldstein, M. ; Jacobs, M.E. ; Suozzi, J.J.
Author_Institution :
Bell Telephone Laboratories, Inc., Whippany, New Jersey 07981
fYear :
1978
fDate :
25-27 Oct. 1978
Firstpage :
387
Lastpage :
390
Abstract :
The capital equivalent cost of consuming ac or dc power in a central office is determined as a function of service life, electric rate and energy inflation rate. The results are used to compute life-cycle equipment costs and to determine the most economical operating point of non-linear power processing devices.
Keywords :
Air conditioning; Alternators; Central office; Costs; Engines; Power generation; Power systems; Rectifiers; Telephony; Ventilation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telephone Energy Conference, 1978. INTELEC '78. International
Conference_Location :
Washington, DC, USA
Type :
conf
DOI :
10.1109/INTLEC.1978.4793578
Filename :
4793578
Link To Document :
بازگشت