Title :
Railway scheduling system using repair-based approach
Author :
Chiang, Te-Wei ; Hau, Hai-Yen
Author_Institution :
Dept. of Electr. Eng., Nat. Taiwan Univ., Taipei, Taiwan
Abstract :
We propose an approach for railway scheduling based on iterative repair, a technique that starts with a complete but possibly flawed schedule and searches through the space of possible repairs. Based on the observation that the decision of the track assignments of trains would influence the performance of the resulting schedule, we divide the scheduling process into two levels. In the first level, a route preprocessing algorithm based on focal search techniques is developed to find the appropriate track assignments for each train. In the second level, an iterative repair algorithm based on tabu search techniques is applied to repair the flawed schedule. The search is guided by an earliest-conflict-first heuristic that attempts to repair the earliest constraint violation while minimizing the value of objective function. We tested this approach with a randomly generated instance and found that it can work in an effective manner
Keywords :
railways; scheduling; search problems; earliest-conflict-first heuristic; focal search techniques; iterative repair; railway scheduling system; repair-based approach; route preprocessing algorithm; scheduling process; tabu search techniques; track assignments; Artificial intelligence; Debugging; Dispatching; History; Iterative algorithms; Iterative methods; Job shop scheduling; Rail transportation; Resource management; System testing;
Conference_Titel :
Tools with Artificial Intelligence, 1995. Proceedings., Seventh International Conference on
Conference_Location :
Herndon, VA
Print_ISBN :
0-8186-7312-5
DOI :
10.1109/TAI.1995.479380