LHC: construction and commissioning status
Author
Evans, L.
Author_Institution
CERN, Geneva
fYear
2007
fDate
25-29 June 2007
Firstpage
1
Lastpage
5
Abstract
The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.
Keywords
accelerator magnets; proton accelerators; storage rings; LHC; Large Hadron Collider; accelerator magnets; triplet quadrupoles; two-ring superconducting proton-proton collider; Colliding beam devices; Collimators; Delay; Detectors; Large Hadron Collider; Persistent currents; Springs; Superconducting magnets; Testing; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440317
Filename
4440317
Link To Document