• DocumentCode
    2885132
  • Title

    A New Beam Search Algorithm for the Large-Scale Permutation FSP

  • Author

    Jin, Feng ; Song, Shi-ji ; Wu, Cheng

  • Author_Institution
    Dept. of Autom., Tsinghua Univ., Beijing
  • fYear
    2006
  • fDate
    13-16 Aug. 2006
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Beam search algorithm, as an adaptation of branch and bound method, is regarded as one of the effective approaches in solving combinational optimization problems. In this paper, a new beam search algorithm for the large-scale permutation flow shop problem is proposed. A new branching scheme is addressed and compared with the traditional branching scheme. With the new branching scheme, the number of partial schedules in search tree can be greatly reduced. To balance the computational effort and solution quality, partial schedules are evaluated with a new approximate function based on forecast. Numerical experiments show that good solutions of large-scale FSPs could be found in a short time with the proposed algorithm
  • Keywords
    combinatorial mathematics; computational complexity; flow shop scheduling; optimisation; tree searching; FSP; beam search algorithm; branch-and-bound method; combinational optimization problems; large-scale permutation flow shop scheduling problem; search tree; Automation; Computational complexity; Cybernetics; Electronic mail; Filters; Job shop scheduling; Large-scale systems; Machine learning; Machine learning algorithms; Manufacturing industries; Optimization methods; Processor scheduling; Scheduling algorithm; Beam search algorithm; NEH algorithm; branching scheme; flow shop scheduling problem;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Machine Learning and Cybernetics, 2006 International Conference on
  • Conference_Location
    Dalian, China
  • Print_ISBN
    1-4244-0061-9
  • Type

    conf

  • DOI
    10.1109/ICMLC.2006.258806
  • Filename
    4028023