DocumentCode
2885132
Title
A New Beam Search Algorithm for the Large-Scale Permutation FSP
Author
Jin, Feng ; Song, Shi-ji ; Wu, Cheng
Author_Institution
Dept. of Autom., Tsinghua Univ., Beijing
fYear
2006
fDate
13-16 Aug. 2006
Firstpage
1
Lastpage
6
Abstract
Beam search algorithm, as an adaptation of branch and bound method, is regarded as one of the effective approaches in solving combinational optimization problems. In this paper, a new beam search algorithm for the large-scale permutation flow shop problem is proposed. A new branching scheme is addressed and compared with the traditional branching scheme. With the new branching scheme, the number of partial schedules in search tree can be greatly reduced. To balance the computational effort and solution quality, partial schedules are evaluated with a new approximate function based on forecast. Numerical experiments show that good solutions of large-scale FSPs could be found in a short time with the proposed algorithm
Keywords
combinatorial mathematics; computational complexity; flow shop scheduling; optimisation; tree searching; FSP; beam search algorithm; branch-and-bound method; combinational optimization problems; large-scale permutation flow shop scheduling problem; search tree; Automation; Computational complexity; Cybernetics; Electronic mail; Filters; Job shop scheduling; Large-scale systems; Machine learning; Machine learning algorithms; Manufacturing industries; Optimization methods; Processor scheduling; Scheduling algorithm; Beam search algorithm; NEH algorithm; branching scheme; flow shop scheduling problem;
fLanguage
English
Publisher
ieee
Conference_Titel
Machine Learning and Cybernetics, 2006 International Conference on
Conference_Location
Dalian, China
Print_ISBN
1-4244-0061-9
Type
conf
DOI
10.1109/ICMLC.2006.258806
Filename
4028023
Link To Document