DocumentCode :
2888343
Title :
A procedure for specifying the engineering EMC requirements of a project
Author :
Wright, John
Author_Institution :
Dept. of Electr. Eng., British Steel plc, UK
fYear :
1999
fDate :
1999
Firstpage :
42522
Lastpage :
42526
Abstract :
Heavy industry in general is experiencing problems caused by a failure to achieve EM compatibility in practice, despite the purchase of CE marked apparatus. This paper describes an EMC procedure being developed by British Steel´s Sections, Plates, and Commercial Steels´ Teesside Works for use when procuring new plant and equipment (apparatus) for a steelworks environment The procedure focuses on essential engineering EM performance requirements
Keywords :
steel industry; British Steel; CE marked apparatus; EM compatibility; EMC procedure; engineering EMC requirements; heavy industry; new equipment procurement; new plant procurement; steelworks environment;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electromagnetic Compatibility in Heavy Power Installations (Ref. No. 1999/066), IEE Colloquium
Conference_Location :
Middlesbrough
Type :
conf
DOI :
10.1049/ic:19990389
Filename :
772212
Link To Document :
بازگشت