  • Abstract
    The CLIC test facility 3 (CTF3) has the objective to demonstrate the remaining feasibility issues of the CLIC two-beam technology for a future multi-TeV linear collider. One key issue is the efficient generation of a very high current ´drive beam´ that serves as the power source for the acceleration of the main beam to high energy. This large current beam is produced by interleaving bunches in a combiner ring using transverse deflecting RF cavities. The 84 m long CTF3 combiner ring and the connecting transfer line have been recently installed and put into operation. The latest commissioning results will be presented.
  • Keywords
    accelerator RF systems; accelerator cavities; commissioning; electron accelerators; electron beams; linear colliders; particle beam bunching; particle beam injection; CLIC test facility 3; CTF3 combiner ring commissioning; high current drive beam; interleaving bunches; power source; transfer line; transverse deflecting RF cavities; two-beam technology; Acceleration; Delay; Electron beams; Joining processes; Linear particle accelerator; Particle beams; Power generation; Radio frequency; Test facilities; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440597
  • Filename
    4440597