CTF3 combiner ring commissioning
Author :
Tecker, F. ; Corsini, R. ; Döbert, S. ; Skowronski, P. ; Urschütz, P. ; Bressi, E. ; Biscari, C. ; Ghigo, A. ; Ferrari, A.
Author_Institution :
CERN, Geneva
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
2850
Lastpage :
2852
Abstract :
The CLIC test facility 3 (CTF3) has the objective to demonstrate the remaining feasibility issues of the CLIC two-beam technology for a future multi-TeV linear collider. One key issue is the efficient generation of a very high current ´drive beam´ that serves as the power source for the acceleration of the main beam to high energy. This large current beam is produced by interleaving bunches in a combiner ring using transverse deflecting RF cavities. The 84 m long CTF3 combiner ring and the connecting transfer line have been recently installed and put into operation. The latest commissioning results will be presented.
Keywords :
accelerator RF systems; accelerator cavities; commissioning; electron accelerators; electron beams; linear colliders; particle beam bunching; particle beam injection; CLIC test facility 3; CTF3 combiner ring commissioning; high current drive beam; interleaving bunches; power source; transfer line; transverse deflecting RF cavities; two-beam technology; Acceleration; Delay; Electron beams; Joining processes; Linear particle accelerator; Particle beams; Power generation; Radio frequency; Test facilities; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4440597
Filename :
4440597
Link To Document :
بازگشت