Title
Commissioning and early experiments with ISAC-II
Author
Laxdal, R.E.
Author_Institution
TRIUMF, Vancouver
fYear
2007
fDate
25-29 June 2007
Firstpage
2593
Lastpage
2597
Abstract
The first phase of the ISAC-II superconducting accelerator has recently been commissioned. The heavy ion linac adds 20MV to the 1.5MeV/u beam injected from the IS AC post accelerator. The linac is composed of five cryomodules; each cryomodule housing four 106 MHz quarter wave resonators and one 9T superconducting solenoid. On-line performance has confirmed cw operation at a peak surface field in excess of 35MV/m. The paper describes the successful commissioning and the early operation with both stable and radioactive beams.
Keywords
ion accelerators; linear accelerators; superconducting coils; superconducting magnets; superconducting resonators; 9T superconducting solenoid; ISAC post accelerator; ISAC-II; cryomod- ules;; cw operation; heavy ion linac; peak surface field; quarter wave resonators; radioactive beams; stable beams; superconducting accelerator; voltage 20 MV; Acceleration; Cyclotrons; Ion accelerators; Ion beams; Linear particle accelerator; Niobium; Nuclear physics; Particle beams; Production; Solenoids;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440720
Filename
4440720
Link To Document