Commissioning of the spallation neutron source accelerator systems
Author :
Plum, M.A.
Author_Institution :
Oak Ridge Nat. Lab., Oak Ridge
fYear :
2007
fDate :
25-29 June 2007
Firstpage :
2603
Lastpage :
2607
Abstract :
The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H" front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs from January to April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS will be discussed.
Keywords :
linear accelerators; neutron sources; particle accelerators; SNS accelerator; accumulator ring; beam dynamics; spallation neutron source accelerator; superconducting linear accelerator; Laboratories; Linear accelerators; Linear particle accelerator; Neutrons; Optical coupling; Particle beam injection; Particle beams; Structural beams; Superconducting devices; US Department of Energy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0916-7
Type :
conf
DOI :
10.1109/PAC.2007.4440722
Filename :
4440722
Link To Document :
بازگشت