• DocumentCode
    2891546
  • Title

    Room temperature structure development for high-current applications

  • Author

    Ferdinand, R.

  • Author_Institution
    GANIL, Caen
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    2564
  • Lastpage
    2568
  • Abstract
    Many new high-current accelerators use both room- temperature and superconducting structures. While it is clear that a low-beam-current, high-duty-cycle accelerator should use superconducting cavities, for high-current (CW) applications room temperature structures are still preferred. This mainly depends on the accelerator constraints and objectives. The paper reviews the new choices made world-wide.
  • Keywords
    linear accelerators; particle accelerators; reviews; high-current applications; high-duty-cycle accelerator; room temperature structure; superconducting cavities; superconducting structures; temperature 293 K to 298 K; Europe; Ion accelerators; Mesons; Neutrino sources; Neutrons; Particle beams; Production; Proton accelerators; Structural beams; Temperature;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440726
  • Filename
    4440726