• DocumentCode
    2893624
  • Title

    Beam commissioning of the SPS LSS6 extraction and TT60 for LHC

  • Author

    Balhan, B. ; Gaxiola, E. ; Goddard, B. ; Gourber-Pace, M. ; Jensen, L. ; Kain, V. ; Koschik, A. ; Kramer, T. ; Uythoven, J. ; Vincke, H. ; Wenninger, J.

  • Author_Institution
    CERN, Geneva
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    1610
  • Lastpage
    1612
  • Abstract
    The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was commissioned with low intensity beam in late 2006. The layout and functionality of the main elements are briefly explained, including the various hardware subsystems and the control system. The systems safety procedures, test objectives and measurements performed during the beam commissioning are described.
  • Keywords
    accelerator control systems; control engineering computing; particle beam extraction; physics computing; proton accelerators; proton beams; synchrotrons; LHC; SPS LSS6 extraction; TT60; beam commissioning; control system; hardware subsystems; Control systems; Extraterrestrial measurements; Instruments; Large Hadron Collider; Magnets; Particle beam injection; Particle beam measurements; Particle beams; Protection; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440839
  • Filename
    4440839