DocumentCode
2893624
Title
Beam commissioning of the SPS LSS6 extraction and TT60 for LHC
Author
Balhan, B. ; Gaxiola, E. ; Goddard, B. ; Gourber-Pace, M. ; Jensen, L. ; Kain, V. ; Koschik, A. ; Kramer, T. ; Uythoven, J. ; Vincke, H. ; Wenninger, J.
Author_Institution
CERN, Geneva
fYear
2007
fDate
25-29 June 2007
Firstpage
1610
Lastpage
1612
Abstract
The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was commissioned with low intensity beam in late 2006. The layout and functionality of the main elements are briefly explained, including the various hardware subsystems and the control system. The systems safety procedures, test objectives and measurements performed during the beam commissioning are described.
Keywords
accelerator control systems; control engineering computing; particle beam extraction; physics computing; proton accelerators; proton beams; synchrotrons; LHC; SPS LSS6 extraction; TT60; beam commissioning; control system; hardware subsystems; Control systems; Extraterrestrial measurements; Instruments; Large Hadron Collider; Magnets; Particle beam injection; Particle beam measurements; Particle beams; Protection; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440839
Filename
4440839
Link To Document