• DocumentCode
    2893728
  • Title

    Status report on the ral front end test stand

  • Author

    Letchford, Alan ; Faircloth, Dan ; Daly, Adeline ; Clarke-Gayther, Michael A. ; Plostinar, Ciprian ; Gabor, Christoph ; Cheng, Yi Aaron ; Jolly, Simon ; Kurup, Ajit ; Savage, Peter ; Pozimski, Jürgen Klaus ; Back, John ; Bermejo, Javier ; Lucas, Julio ; A

  • Author_Institution
    CCLRC/RAL/ISIS, Didcot
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    1634
  • Lastpage
    1636
  • Abstract
    High power proton accelerators (HPPAs) with beam powers in the several megawatt range have many applications including drivers for spallation neutron sources [1],neutrino factories [2], waste transmuters and tritium production facilities. The UK´s commitment to the development of the next generation of HPPAs is demonstrated by a test stand being constructed in collaboration between RAL,Imperial College London, the University of Warwick and the Universidad del Pais Vasco. The aim of the RAL Front End Test Stand is to demonstrate that chopped low energy beams of high quality can be produced and is intended to allow generic experiments exploring a variety of operational conditions. This paper describes the status of the RAL Front End Test Stand.
  • Keywords
    beam choppers; beam handling techniques; klystrons; linear accelerators; proton accelerators; HPPA; High power proton accelerators; RAL Front End Test Stand; RFQ accelerator; beam chopper; klystron; Educational institutions; FETs; Linear particle accelerator; Neutrino sources; Particle beams; Production facilities; Proton accelerators; Radio frequency; Structural beams; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4440847
  • Filename
    4440847